Where Energy Code Lives in the IRC

Chapter 11 runs from N1101 administration through N1104 lighting. N1101.7 and Table N1101.7 fix your climate zone, and that number drives every lookup in the chapter. This guide follows the 2021 IRC numbering, and numbers move between editions, so confirm each citation in your book.

Two Tables, One Maximum and One Minimum

N1102.1.2 carries Table N1102.1.2, maximum assembly U-factors and fenestration requirements. N1102.1.3 carries Table N1102.1.3, insulation minimum R-values by component. One caps heat flow, the other sets a floor, and exam items mix them.

From Table N1102.1.3: ceiling R-30 in zone 1, R-49 in zones 2 and 3, R-60 in zones 4 through 8. Wood frame walls R-13 in zones 0 through 2, R-20 or R-13 plus R-10 continuous in zone 3, and R-30 or R-20 plus R-5 continuous or R-13 plus R-10 continuous in zones 4 through 8. From Table N1102.1.2: fenestration U-factor not required in zones 0 and 1, 0.40 in zone 2, 0.30 in zones 3 through 8; glazed SHGC 0.25 in zones 0 through 3, 0.40 in zones 4 and 5, not required in zones 6 through 8.

Ceilings: Depth, Baffles, Hatches

N1102.2.1 is the trade-down that writers love. Where R-49 is required, R-38 over 100 percent of the area satisfies it, and where R-60 is required, R-49 does, but only where full-height uncompressed insulation extends over the wall top plate at the eaves. It does not apply to the total UA alternative (N1102.1.5).

N1102.2.2 covers ceilings without attics: R-30 is the floor where the space is too shallow, capped at 500 square feet or 20 percent of the insulated ceiling area. N1102.2.3 requires an eave baffle at soffit and eave vents holding at least the net free area of the vent, and N1102.2.4 requires hatches and doors to match the assembly they penetrate. In the field you check depth against the plan.

Walls, Corners and Headers

Corners and headers of frame walls must be completely filled with material of at least R-3 per inch, and exterior insulation must sit in substantial contact with a continuous air barrier (Table N1102.4.1.1). Footnote a to Table N1102.1.3 closes the escape route: where the cavity is shallower than the labeled thickness, the installed R-value still has to meet the table.

Slabs, Basements and Crawl Spaces

Slabs with a surface less than 12 inches below grade follow Table N1102.1.3: R-10 at 2 feet of depth in zone 3 and R-10 at 4 feet in zones 4 through 8 (N1102.2.9). Basement walls take R-5 continuous or R-13 cavity in zone 3, R-10 continuous or R-13 in zone 4, and R-15 continuous or R-19 cavity or R-13 plus R-5 continuous in zones 5 through 8, installed from the top of the wall down to 10 feet below grade or the floor, whichever is less (N1102.2.8.1). Crawl space walls are fastened and run to grade plus 24 inches (N1102.2.10.1). Exposed foundation insulation needs a rigid, opaque cover extending 6 inches below grade (N1101.11.1).

Air Sealing and the Blower Door

N1102.4.1.1 requires a continuous air barrier, with a table naming what gets sealed at rim joists, shafts, recessed lights and foundation joints. N1102.4.1.2 requires a test to ANSI/RESNET/ICC 380, ASTM E779 or ASTM E1827, reported at 0.2 inch water gauge, which is 50 pascals, and caps leakage at 5.0 air changes per hour or 0.28 cubic feet per minute per square foot of enclosure area. N1102.4.1.3 tightens it for the prescriptive path: 5.0 air changes per hour in zones 0, 1 and 2, and 3.0 in zones 3 through 8. Recessed luminaires must be IC-rated and labeled at 2.0 cfm or less (N1102.4.5), and outlet boxes must be air-sealed and tested to NEMA OS 4 (N1102.4.6).

Ducts: R-8, Sealed, Tested

Ducts outside conditioned space need R-8 at 3 inches and larger, R-6 below that (N1103.3.1). Ducts, air handlers and filter boxes must be sealed with joints per M1601.4.1 (N1103.3.4), and the air handler must be designated at 2 percent leakage or less when tested to ASHRAE 193 (N1103.3.4.1). N1103.3.6 caps leakage at 4.0 cfm per 100 square feet of floor area on a rough-in test with the air handler installed, 3.0 without it, 4.0 after construction and 8.0 for ducts inside the envelope. Framing cavities cannot serve as ducts (N1103.3.7).

Vapor Retarders by Class

N1102.1.1 sends you to R702.7. Table R702.7(1) defines Class I at 0.1 perm or less, Class II above 0.1 up to 1.0, and Class III above 1.0 up to 10. Table R702.7(2) assigns them by zone: zones 1 and 2 permit Class III only, zones 3 and 4 except Marine permit Class II or III, and Marine 4 plus zones 5 through 8 permit Class I or II, with Class III only under the Table R702.7(3) conditions. No vapor retarder is required in zones 1, 2 and 3.

Installation Quality and the Grade Labels

Grade I, II and III are not IRC terms. Those labels come from the insulation grading in ANSI/RESNET/ICC 301, used by raters and above-code programs. The IRC reaches the same place through N1101.11 (installation per the manufacturer), Table N1102.4.1.1 and the installed R-value footnote. What the inspector verifies is contact, full fill, no compression and a continuous air barrier.

What the Exam Actually Asks

The B1 exam is open book with 60 questions in two hours. Energy items are observation items: a zone 5 plan calls for R-60, the inspector finds R-49 batts that stop short of the top plate, and the item turns on N1102.2.1. Drill the pairs that look alike: R-49 against R-60, 5.0 against 3.0 air changes, R-8 against R-6, 4.0 against 8.0 cfm.

Pair this guide with the IRC mechanical and HVAC guide for duct systems in Chapter 16, the roof inspection guide for attic ventilation, and the foundations guide for the slab and basement details this chapter references. Then run index drills from the IRC study guide, try a free ICC practice question, or take a timed set from the practice plans.

Related Study Platforms

RealtyLicence

Pursuing a Canadian real estate licence instead? RealtyLicence prepares you for the OACIQ, RECO, BCFSA and RECA exams with AI-powered practice questions, theory and exam simulations.

realtylicence.com →

Metierium

Preparing for a Quebec construction trade exam instead? Metierium covers the CMEQ, CMMTQ, QBQ, CCQ and RBQ certification exams with theory, practice exams and an AI tutor.

metierium.com →

Red Seal Practice

Preparing for a Red Seal trade exam instead? Red Seal Practice covers the interprovincial Red Seal exams across 54 trades with theory, practice questions and exam simulations.

redsealpractice.com →

Sky License FAA

Training for the FAA A&P written tests instead? Sky License covers the FAA General, Airframe and Powerplant knowledge exams with AI-powered practice questions and full exam simulations.

skylicense.cloud →

Skylicence Canada

Training for a Canadian AME licence instead? Skylicence Canada covers the Transport Canada Aircraft Maintenance Engineer (AME) exams — License M, E and S — with AI-powered theory, practice questions and exam simulations.

skylicence.cloud →

Skylicence Europe

Pursuing an EASA Part-66 licence in Europe instead? Skylicence Europe covers the Part-66 modules for aircraft maintenance licences with AI-powered theory and practice exams.

skylicence.com →

Sky107

Getting your FAA Part 107 drone licence instead? Sky107 prepares you for the FAA UAG written test with 60-question exam simulations and practice questions.

sky107.com →

CCMAPractice

Preparing for the NHA CCMA certification exam instead? CCMAPractice covers the Certified Clinical Medical Assistant exam blueprint with AI-powered practice questions, theory and exam simulations.

ccmapractice.com →

Master Electrician Practice

Pursuing your Master Electrician license instead? Master Electrician Practice covers the Texas Master Electrician exam (TDLR, administered by PSI) — NEC Knowledge and Calculations portions — with official-blueprint practice on the 2026 NEC, code-cited explanations and exam simulations.

masterelectricianpractice.com →